Skip to product information
1 of 6

DIYSELF 30 Pack Box Cutter Heavy Duty Aluminium Shell Utility Knife | SK5 Steel Sharp Blade | Retractable Knife for Cutting Cartons Ropes and Cardboard | Home and Office Use (Red)

DIYSELF 30 Pack Box Cutter Heavy Duty Aluminium Shell Utility Knife | SK5 Steel Sharp Blade | Retractable Knife for Cutting Cartons Ropes and Cardboard | Home and Office Use (Red)

✔ 14 Day Money Back Guarantee

✔ Secure Checkout (SSL Protected)

Regular price $100.99 USD
Regular price Sale price $100.99 USD
Sale Sold out
Shipping calculated at checkout.

About This

  • Package Contents: This set includes 30 heavy-duty retractable utility knives, expertly crafted from durable aluminum. These knives are ideal for cutting cartons, ropes, boxes, and cardboard. Each knife features a comfortable grip, a wider retractable blade, and a convenient small hole at the tail for easy retrieval and storage.
  • How to Use: Our utility knives are designed for simplicity and practicality. To adjust the retractable blade length, simply press and hold the slider. With three length adjustments, these knives offer the versatility needed for various cutting scenarios in your daily life, making them a reliable tool for everyday tasks.
  • Blade Replacement: Replacing the blade is a breeze with our design. Just unscrew the middle screw and open the casing to replace the blade, saving you valuable time. Our utility knives are compatible with most trapezoidal blades available on the market, eliminating the hassle of finding specific replacements.
  • Material Insights: Crafted with an aluminum alloy shell, our utility knives provide a comfortable grip and resistance to falls. The retractable blade is made from specially treated steel, ensuring hardness, resistance, and durability for prolonged cutting tasks. This combination of materials guarantees a reliable and long-lasting tool.
  • About Us: At DIYSELF, we are dedicated to crafting exceptional utility knives that blend innovation with quality. Our mission is to provide reliable tools that cater to all your cutting needs. Your satisfaction is our top priority, so feel free to reach out to us with any questions or concerns.

Overview

  • Material : Alloy Steel
  • Brand : DIYSELF
  • Color : Red
  • Handle Material : Aluminum
  • Blade Material : Carbon Steel
  • Style : Retractable
  • Manufacturer : DIYSELF
Quantity

13 in stock

View full details

Frequently Asked Questions

We do not currently offer free shipping. However, this may be added at some point. We apologize.

Shipping takes place within 3-5 business days. If there is a problem with the shipment of the product, we will notify you via the email address you entered when ordering.

If your order has been shipped, we will add the tracking number to your order and notify you via the email address you entered when ordering.

For returns or exchanges, please contact us within 14 days of receiving the product, along with a receipt or screenshot of the purchase, and a photo of the product with the packaging or tag intact.