Skip to product information
1 of 6

DIYSELF 2Pack Utility Knife Box Cutter Retractable Razor Blade Heavy Duty Box Cutters Knife PVC Pipe Cutter (Red)

DIYSELF 2Pack Utility Knife Box Cutter Retractable Razor Blade Heavy Duty Box Cutters Knife PVC Pipe Cutter (Red)

✔ 14 Day Money Back Guarantee

✔ Secure Checkout (SSL Protected)

Regular price $20.99 USD
Regular price Sale price $20.99 USD
Sale Sold out
Shipping calculated at checkout.

About This

  • All-Metal Construction: Built with a lightweight yet durable aluminum alloy shell and a sharp SK-5 high carbon steel blade, this box cutter delivers reliable cutting power for everyday tasks. Suitable for cutting a wide range of materials from paper and cardboard, to rope, carpet, packaging film, and medium-thickness plastics like foam boards and blister packs. The full-metal handle enhances longevity and provides a solid, comfortable grip.
  • Retractable Blade Design: Features a retractable blade system with multiple fixed lengths, allowing precise control during operation. The slider mechanism locks the blade firmly in place to prevent accidental slips or retraction. This design improves cutting accuracy and ensures safer handling during both indoor and outdoor use. Ideal for packaging, crafting, and warehouse work.
  • Slim and Portable: Measuring just 5.9 inches in length with a slim 0.6-inch profile, this box cutter retractable fits easily into pockets, drawers, and toolboxes. A built-in lanyard hole allows for optional hanging or tethering. The compact structure is ideal for small workspaces and on-the-go use, keeping your cutting tool accessible and organized at all times.
  • Quick Blade Replacement: Blades can be replaced in seconds using a standard screwdriver. The interior holds the blade securely with a fixed screw mechanism, ensuring stability during cutting. Compatible with most standard SK-5 utility blades, the box cuttes provides a simple and efficient way to maintain performance without needing special tools or complex procedures.
  • 8 Color Options: Available in 8 distinct colors—black, blue, green, orange, pink, red, silver, and yellow—this razor knife adds both style and practicality to your toolkit. The color variety makes it easier to assign tools by project, team member, or environment, while also reducing the risk of misplacement or confusion in multi-user settings.

Overview

  • Material : Metal
  • Brand : DIYSELF
  • Color : Red
  • Item Length : 2.36 Inches
  • Handle Material : Metal
  • Blade Material : Metal
  • Blade Length : 2.36 Inches
  • Style : Ergonomic
  • Manufacturer : DIYSELF
  • UPC : 780744215945
Quantity

30 in stock

View full details

Frequently Asked Questions

We do not currently offer free shipping. However, this may be added at some point. We apologize.

Shipping takes place within 3-5 business days. If there is a problem with the shipment of the product, we will notify you via the email address you entered when ordering.

If your order has been shipped, we will add the tracking number to your order and notify you via the email address you entered when ordering.

For returns or exchanges, please contact us within 14 days of receiving the product, along with a receipt or screenshot of the purchase, and a photo of the product with the packaging or tag intact.